The Design

The detailed design was developed from the summer of 2012 to spring 2013.

It was developed in consultation with a number of local stakeholder organisations and individuals. A summary of consultations is provided here

An overview of the design is provided here

For a comprehensive description of the detailed design please see the detailed design report here

 

_________________________________________________________________
Hexham River Hydro, an energyshare project made possible by British Gas and supported by Carbon Leapfrog, Cooperative Enterprise Hub, Vattenfall and The Naturesave Trust